Facebook
Categories
Categories

Surlon Power Visits the 2026 Hong Kong International Lighting Fair (Autumn Edition)

Surlon Power visited Hong Kong’s 2026 Autumn Lighting Fair as a trade visitor. The company highlights battery integration priorities and welcomes lighting OEM inquiries.
Nov 12th,2026 18 Views

Dongguan, China — November 12, 2026 — Surlon Power visited the HKTDC Hong Kong International Lighting Fair (Autumn Edition) 2026 as a trade visitor. The exhibition took place from October 27 to 30 at the Hong Kong Convention and Exhibition Centre.

Surlon Power attended as a visitor rather than an exhibitor and did not operate a booth at the event. This post-show update sets out practical battery integration priorities for lighting manufacturers and invites project-specific inquiries following the fair.

From Lighting Concepts to a Clear Battery Specification

The fair's official programme highlighted LED, smart and connected lighting alongside architectural and outdoor lighting solutions. For rechargeable and backup-powered lighting products, turning a design concept into an equipment specification also requires a clear definition of the battery, charger and installation environment.

Surlon Power's lighting battery range provides reference configurations for OEM review. Selection should begin with the complete luminaire's requirements, including input-voltage limits, operating load, target runtime and the space available for the battery and wiring. Nominal voltage or amp-hour capacity alone does not establish compatibility.

Three Priorities for Lighting OEM Projects

1. Define the actual operating duty

Specify the light output and operating mode that the runtime target must support. For a product with dimming, standby electronics or intermittent wireless communication, include every operating state in the energy budget. Any runtime claim should be checked with the intended luminaire and its real control settings.

2. Review charging and environmental conditions together

The battery chemistry, charge profile, termination conditions and permitted charging temperatures need to match the selected build. Outdoor and solar-powered lighting also require an equipment-level review of moisture exposure, enclosure protection, heat buildup and charging availability. A battery component specification does not establish compliance of the finished lighting system.

3. Resolve the mechanical and electrical interfaces early

Battery dimensions, mounting clearance, connector pinout, lead length and strain relief can affect both assembly and service access. Agreeing on these details before sample approval helps turn a broad battery inquiry into a specification that can be evaluated consistently. Protection and sensing requirements should also be recorded in the project brief.

Continuing the Conversation after Hong Kong

Lighting brands, equipment developers and sourcing teams are welcome to send Surlon Power their battery requirements for review. A useful inquiry includes the application, voltage range, measured or estimated load, runtime target, compartment drawing, connector details, charging arrangement and operating environment.

For commercial planning, include sample quantity, estimated annual volume, destination market and required test documentation. The next steps, including configuration review, sample validation, MOQ and lead time, should be agreed for the specific project.

Use the custom lithium battery pack RFQ checklist to organize your brief, or contact Surlon Power about an OEM lighting battery project. Email market@surlonpower.com with the subject Hong Kong Lighting Fair 2026 — OEM Battery Inquiry.

Event dates and venue: HKTDC official fair information. This article reports attendance as a trade visitor, not exhibitor participation or a product launch at the fair.

REQUEST A BATTERY QUOTE

Tell us about your equipment and battery requirements. Share the details you know, and our team can discuss the next steps for your project.
Name
Email *
Message
Leave a message
Name
Email *
Message
Message Us